精品国产乱码久久久久久108,日本一区最新不卡,亚洲区二区,偷拍自超碰

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類(lèi)導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(guó)(山東)自由貿(mào)易試驗(yàn)區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號(hào)章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號(hào)樓 101

冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應(yīng)根據(jù)設(shè)備的各種條件,考慮其安裝位置的地面及其荷載能力,同時(shí)也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時(shí)應(yīng)注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預(yù)埋好水平鋼板,各基礎(chǔ)點(diǎn)的標(biāo)高應(yīng)在同一標(biāo)高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應(yīng)放置水平。水塔在施工安裝時(shí),為防止壓壞底盤(pán),施工人員應(yīng)踏在底盤(pán)的加強(qiáng)筋上,在安裝塔外殼、底盤(pán)等纖維件時(shí),為防止外殼底盤(pán)等變形可先穿螺釘,而后依次逐漸緊固,在確認(rèn)底盤(pán)不變形,附近干凈、干燥的條件下,為避免使用時(shí)漏水可在接觸處鋪設(shè)纖維氈及涂樹(shù)脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風(fēng)不良和出現(xiàn)濕空氣回流的場(chǎng)合,須安裝在通風(fēng)良好的場(chǎng)所。否則將會(huì)降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤(pán)向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時(shí),應(yīng)根據(jù)施工圖指明的坐標(biāo)位置就位,并應(yīng)找平找正,設(shè)備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應(yīng)正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
久久久久国产一毛片| 婷婷五z| 丁香五月婷婷动漫在线| 久久久久日本国产一区二区| 欧美AAA精品九八五| 久久极品成人香蕉视频| 国产美女日韩欧美在线观看| 日韩欧美人妻自拍| 天堂一区√| 日日骚91.99| 操日本美女的大骚逼视频| 亚洲色AV免费在线| 日本草逼网址视频| 91色秘 乱码一区二区| 一区全黄人妻精品久久爽| AV老司机亚洲一区二区| 国产成人视频亚洲再找| 国产精品主播第一页| 久泰国人妻精品| 哪吒之魔童闹海 电影| 久久台啪精品| 2020AV天天日天天射| 日韩人妻一区二区三区费| 欧美视频633625163区| 国产无码爆操一区二区三区| 拍真实国产乱淫精品| 欧美黄片一区二区三区四区久久| 干B久久久久久久久久久久| 亚洲午夜精品久久久久人妖| 久久青草热| 欧美熟妇综合网| 国产精品厕所一区| 欧美91网| 亚洲理论片777| 刘玥欧美专区视频在线观看| 、国产欧美精品一区二区综合| 欧美在线日韩,国产在线看| 亚洲AV毛片基地| 亚洲艹B视频在线观看| 黄色成人av影视| 日本一区二区兽兽|